Expansion of Block Production at Cardiff

The production of dense concrete blocks at Cardiff took another leap forwards over the summer with the construction of a purpose built block yard. The yard has a quality finish and a high tolerance flatness that provides a superior surface to cast blocks on. This ensures the operation can manufacture blocks to the highest standard and increases the production capacity. The yard has been incorporated into the site Vehicle Management Plan designed to keep pedestrians separated from vehicles on site. The project was completed over a period of 3 months and without any reported accidents or incidents.

Simon Spiteri

Simon Spiteri sales director for Castle Environmental. A UK hazardous waste management company headquartered at Ilkeston in Derbyshire. Castle also has sites in the West Midlands and South Wales, and serves industrial and commercial business across the UK with waste collection, treatment, disposal and recycling solutions.

https://www.linkedin.com/in/simon-spiteri-935ba4199/
Previous
Previous

Record Throughput at the Ilkeston Site

Next
Next

Castle Environmental satisfy End of Waste criteria